MEPCO Demand Notice Fee

MEPCO Demand Notice Fee by Category 2025 – [Full Guide]

Introduction

Applying for a new electricity connection through MEPCO (Multan Electric Power Company) comes with a set of procedures, one of which is paying the MEPCO Demand Notice Fee. This guide explains everything you need to know about MEPCO Demand Notice Fee by category in 2025 — from how much you’ll pay to how to apply, track, and complete the connection process.

Categories of New Connections

MEPCO offers different types of connections based on your usage and category:

– Domestic (Single-phase & Three-phase)

– Agricultural Tubewell Connections

– Industrial Connections

– Commercial and Society-based Connections

Domestic Single‑Phase MEPCO Fee 2025

Single-phase connections are commonly used for small homes. Here are the estimated fees:

– **Rural Areas**: PKR 9,000 – 9,500

– **Urban Areas**: PKR 14,000 – 15,000

– **Private Colonies**: PKR 18,000 – 20,000

Note: These prices may vary based on area and updates from MEPCO. Always verify with the official MEPCO office or helpline.

Domestic Three‑Phase Demand Notice 2025

Three-phase connections are generally for larger homes or properties exceeding 5 marlas. Estimated fee range:

– PKR 90,000 – 110,000 (depending on location and wiring needs)

– Payment is made via designated banks such as UBL, ABL, and HBL

Make sure to pay the demand notice within the given timeline, typically one month from issuance.

Agriculture Tubewell Three-Phase Demand Notice Fee

For agricultural consumers, especially for tubewells, the demand notice fee ranges significantly:

– Estimated Cost: PKR 500,000 – 1,000,000

– This includes infrastructure setup like poles, transformers, three-phase meters, and wiring.

Fees may vary depending on land area, distance from grid, and local installation needs.

Industrial and Societies Connection Fees

Fees for industrial setups and residential/commercial societies vary based on usage and load:

– **Industrial Three-Phase**: PKR 150,000 – 500,000+

– **High Tension (HT)**: Can range from PKR 1,000,000 – 5,000,000+

– **Society (Single-Phase per unit)**: PKR 20,000 – 50,000

– **Society (Three-Phase per unit)**: PKR 50,000 – 200,000

Summary of Estimated Charges by Category (MEPCO Demand Notice Fee)

Here’s a quick breakdown of MEPCO connection charges by type:

Connection Type | Estimated Charges (PKR)

—————-|————————-

Domestic Single Phase | 9,000 – 20,000

Domestic Three Phase | 90,000 – 110,000

Commercial Single Phase | 22,000 – 25,000

111

Commercial Three Phase | 100,000 – 160,000

Agricultural Tubewell | 500,000 – 1,000,000

Industrial Three Phase | 150,000 – 500,000

Societies (Single Phase) | 20,000 – 50,000

Societies (Three Phase) | 50,000 – 200,000

About MEPCO

MEPCO (Multan Electric Power Company) serves the southern Punjab region in Pakistan. It is responsible for:

– Electricity distribution and supply

– Billing, metering, and payments

– Repair, maintenance, and customer services

– Handling new connections and complaints

MEPCO Service Areas

MEPCO operates in multiple districts:

– Multan, Bahawalpur, Lodhran, Khanewal, Vehari

– Rahim Yar Khan, Muzaffargarh, and surrounding areas

Consumer Categories Served

MEPCO provides electricity to a wide range of consumers:

– Domestic

– Commercial

– Industrial

– Agricultural

– Societies and bulk users

MEPCO New Connection Process (2025)

Here are the main steps to apply for a new MEPCO connection:

– **Step 1**: Submit an application online through the ENC (Electricity New Connection) portal or visit a MEPCO office.

– **Step 2**: Upload required documents like CNIC, ownership proof, and a photo.

– **Step 3**: MEPCO will review the application, conduct a feasibility check, and issue a demand notice.

– **Step 4**: Pay the demand notice fee at a listed bank.

– **Step 5**: After payment, MEPCO will inspect and install your meter.

How to Apply Online for a New MEPCO Connection

To apply through the ENC portal:

– Visit the ENC website and select ‘Apply Online’

– Fill in your personal and property details

– Upload CNIC, proof of ownership, and for industrial use — additional documents

– Submit your form and track your application online using the portal

Documents Required

The documents you need may differ based on category:

– **Domestic**: CNIC, proof of ownership, sworn statement

– **Industrial**: Business registration, layout plans, etc.

Final Tips

Before applying, make sure:

– All documents are correctly filled and attested

– You confirm the latest fees from MEPCO directly

– You track your demand notice and application via the ENC portal

Applying correctly the first time will help avoid delays or rejections.